Please use this identifier to cite or link to this item: https://scholar.utcc.ac.th/handle/6626976254/992
DC FieldValueLanguage
dc.contributor.authorPatangmongkol, Nattida
dc.contributor.otherUniversity of the Thai Chamber of Commerce. Graduate School
dc.date.accessioned2018-09-13T09:57:13Z-
dc.date.available2018-09-13T09:57:13Z-
dc.date.issued2012
dc.identifier.citationNattida Patangmongkol (2012) An Analysis of Financial Costs and Returns of Solar-energy ElectricityProduction and Sale: The Case of Nakhon Ratchasima Province.
dc.identifier.urihttps://scholar.utcc.ac.th/handle/6626976254/992-
dc.description.abstractThe electricity energy is one of the most important basic factors for human living. It drives thecountry’s economic and social developments. Meanwhile electricity demand rapidly increases, its productionfactors decrease. Therefore, the National Energy Policy Office and the Electricity Generating Authority ofThailand have tried to look for alternative energies, which are non-destructive for the environment,to substitute for fuel energies. The government itself is currently supporting Very Small Power Producers(VSPPs) who are able to produce and distribute less-than-10-megawatt electricity with renewable energy.Of all the VSPPs, those who produce and distribute solar-energy electricity rank the top, given thegovernment’s highest adder (extra-money) buying ratio of the solar energy. The support is grounded onfree, non-polluted and environmental-friendly qualities of the solar energy. The present study carries out the analysis of financial costs and returns of a 6-megawattmulti-crystalline solar-energy electricity production project in Nakhonratchasima Province, where solar-energyelectricity production is flourish.The project life is set at 25 years, with the highest commercial bank lendinginterest rate of 8.85% as a discount rate for the study. The study proves the project is worthwhile forinvestment, according to different financial measures: The project’s NPV is positive; the B/C ratio is more than1; the IRR is higher than the borrowing interest rate; the payback period is 8 years 1 month and 13 days.Sensitivity analyses, including a 5% rise in costs with fixed returns, a 5% of reduction in returns with fixedcosts and a 5% rise in both costs and returns, also prove the project worth investing.
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherUniversity of the Thai Chamber of Commerce
dc.rightsThis work is protected by copyright. Reproduction or distribution of the work in any format is prohibited without written permission of the copyright owner.
dc.subject.otherBusiness Economics
dc.titleAn Analysis of Financial Costs and Returns of Solar-energy ElectricityProduction and Sale: The Case of Nakhon Ratchasima Province
dc.typeThesis
dcterms.accessRightspublic
dc.rights.holderUniversity of the Thai Chamber of Commerce
thesis.degree.departmentSchool of Economics
thesis.degree.grantorUniversity of the Thai Chamber of Commerce
thesis.degree.levelmasters
utcc.eprintid2264
Appears in Collections:GS: Theses / Independent Studies
Files in This Item:
File Description SizeFormat 
2264abstract.pdf90.22 kBAdobe PDFThumbnail
View/Open
2264fulltext.pdf1.23 MBAdobe PDFThumbnail
View/Open
2264summary.pdf173.79 kBAdobe PDFThumbnail
View/Open
Show simple item record Recommend this item

Page view(s) 50

5
checked on Aug 28, 2019

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.